PUBLIC SPACE ALLEY – LIGHT SYSTEM RELOCATION
The Public Space Alley – Light System Relocation project was a time sensitive project subcontracted to Fort Myer Construction by McCullough Construction, LLC to replace the public space alley lighting system from the south side to the north side of the alley read more...
PEPCO VAULT LOWERING AT 9TH & MONROE STREET
The Pepco Vault Lowering project was an emergency project subcontracted to Fort Myer Construction by Horning Brothers to lower the side walls of a PEPCO Vault on the northeast corner of Monroe Street and 9th Street. Fort Myer’s responsibilities included exca read more...
DC COMPREHENSIVE FIELD MAINTENANCE & MANAGEMENT
Comprehensive Field Maintenance and Management Services was a 5-year contract where Fort Myer Construction service approximately 159 acres of athletic fields at 68 sites operated by DPR in Wards 1 thru 8. Fort Myer Construction’s responsibilities incl read more...
WEST END SQUARE 50 – SITE UTILITIES
The West End Square 50 project consisted of the demolishing of an aged firehouse and the construction of a nine-story building with one level of below-grade parking. The building features a new fire station for the Washington, D.C. Fire Department and a 20,000 read more...
URBAN STORMWATER RETROFIT
In 2014, Prince George’s County was faced with an enormous regulatory challenge in the management of its National Pollutant Discharge Elimination System and its Municipal Separate Storm Sewer System (MS4) Permit that needed an innovative solution. The Urban read more...
THE WHARF PHASE 1– ASPHALT/CONCRETE PAVING
The Wharf is reestablishing Washington, DC as a waterfront city and destination. This remarkable, mile-long stretch along the Potomac River is coming to life with restaurants, retailers, residences, and businesses—all complemented by monumental views and a v read more...
VAN BUREN BRIDGE REPLACEMENT
The Van Buren Bridge project replaced the existing Van Buren Bridge to accommodate pedestrians along the corridor to the East Falls Church Metro. The previous bridge had no pedestrian access and was identified as “structurally deficient” during its annual read more...
PEPCO DUCT BANKS – POTOMAC ANNEX
The Pepco Duct Banks – Potomac Annex project was for the construction of electrical system distribution improvements required to support the building renovations. This work entailed excavation trenching, installation of duct banks and equipment vaults to sup read more...