Projects
DULLES TOLL ROAD NOISE WALLS NW2
In this contract, FMCC reconstructed approximately 2,050 LF of Noise Wall #2, located at Mclean Hamlet, east of Spring Hill Road along westbound Dulles Toll Road (DTR) and approximately 3,550 LF of Noise Wall #3, located at Ordick Corner, east of Route 7 inter read more...
LOCAL PAVEMENT RESTORATION CITYWIDE
Fort Myer Construction was a subcontractor to Capitol Paving for this IDIQ contract. Scope of work included resurfacing existing roadways on DC’s major roads, historic locations, and residential areas including, RFK stadium, New York Avenue, Connecticut Aven read more...
PAVEMENT RESTORATION IDIQ
Fort Myer Construction was retained for this pavement restoration IDIQ 4 Year Option contract as part of Fairfax Water’s efforts to quickly restore concrete and asphalt after the replacement of water mains and other underground utilities. Fort Myer’ read more...
ROCK CREEK PARKWAY – BEACH DRIVE RECONSTRUCTION
Beach Drive is a busy commuter route in Northwest DC. In the past it was deteriorated for years, in despair of cracks, crumbling roadways, and six eroding bridges along the 6.5 mile stretch. Fort Myer Construction worked on the 4 phase project that rehabilitat read more...
NORTHEAST BOUNDARY TUNNEL – UTILITY RELOCATIONS (DIVISION U)
The Northeast Boundary Tunnel (NEBT) project comprised a system of tunnels and diversion sewers for the capture of combined sewer overflows, mitigating sewer flooding and improving the water quality of the Anacostia River. The water captured by the NEBT tunnel read more...
I-66 MULTIMODAL IMPROVEMENTS
This project was one of the first improvements for I-66 Inside the Beltway in the last 20 years. Previously, I-66 Inside the Beltway was only restricted to carpool vehicles with authorized clean special fuel license plates, Dulles airport travelers, and law en read more...
ROUTE 1 WIDENING IN PRINCE WILLIAM COUNTY
This contract involves widening Route 1 from a four to a six lane divided highway between Marys Way and Annapolis Way and new bridge construction. The project includes: Enhanced access to the Woodbridge VRE kiss-and-ride facility A new Route 1 bridge at Marums read more...
DULLES TOLL ROAD SOUND WALL REPLACEMENT SW-112
In this contract, Fort Myer Construction replaced existing sound wall SW-112 along Dulles Toll Road. Our team provided all labor, material, equipment necessary to replace the concrete panel on Sound Wall SW-112. We were also responsible for field survey, detai read more...