CONSTRUCTION OF DIAMOND TEAGUE PARK
This park construction project involved site demolition and site preparation, construction of piers, docks, gangways, pedestrian walkways and floating docks, installation of electrical lighting, fencing, and landscaping. Project Significance This comple read more...
CITYWIDE SIDEWALK PAVEMENT RESTORATION
DDOT awarded Fort Myer Construction Corporation this contract to make various repairs to existing pavement structures such as pavement base, curbs, gutters, sidewalks, driveway entrances. This contract also included constructing wheelchair and bicycle ramps to read more...
THEODORE ROOSEVELT BRIDGE MOVEABLE BARRIER
Since 1997, DDOT has been operating with Quickchange Moveable Barrier (QMB) technology on the Theodore Roosevelt Bridge. The Moveable Barrier System (MBS) consists of a Barrier Transfer Machine (BTM) and approximately 4,500 feet of portable concrete barriers. read more...
KENILWORTH PARKSIDE ATHLETIC FIELD
Fort Myer’s work on the Kenilworth Parkside Athletic Field included construction of a rubberized asphalt running track, a football field with spectator stands, and renovated comfort station facilities. The project also included renovation construction and of read more...
LONG BRIDGE PARK
Long Bridge Park is a new park located at 475 Old Jefferson Davis Highway. Building a park at the site transformed what was once a light industrial area into a distinctive showplace of environmentally sound redevelopment, featuring a central expanse of attract read more...
ANACOSTIA 2nd HIGH UTILITIES SERVICE
The project consisted of the replacement and reconnection of 28,500 linear feet or more than 5 miles of water service at various locations in Southeast Washington, DC. Construction involved valve work, relocation of sanitary and storm water systems, gas mains, read more...
CHELTENHAM YOUTH DETENTION CENTER
The latest addition to the Cheltenham Youth Facility in Prince George’s County, Maryland was led by Turner Construction and required they demolish a number of outdated buildings on the site before beginning construction on a 100,000 square foot, 72-bed deten read more...
ANACOSTIA FREEWAY BRIDGES RECONSTRUCTION
The project consisted of the rehabilitation of the northbound and southbound lanes of the Anacostia Freeway over Malcolm X Avenue, SE and the southbound ramp onto South Capitol Street. Major work included rehabilitating abutments, removing and replacing struct read more...