Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

CHELTENHAM YOUTH DETENTION CENTER

CHELTENHAM YOUTH DETENTION CENTER





The latest addition to the Cheltenham Youth Facility in Prince George’s County, Maryland was led by Turner Construction and required they demolish a number of outdated buildings on the site before beginning construction on a 100,000 square foot, 72-bed detention facility to house male juvenile offenders in need of secure services. Fort Myer was retained as a subcontractor for Turner Construction to oversee site work and outdoor recreational space. The project which included installation of several bio-retention ponds, excavation of parking lots, track and sidewalks, asphalt and porous paving, porous asphalt at rubberized running track and outdoor basketball court. We were also responsible for HMA Superpave at 3  basketball courts, grass pave fire truck access lanes, pavement markings and striping, concrete footings for site furniture including flag poles, bike rack loops, and athletic posts.

 

Project Significance

This project demonstrates Fort Myer Construction’s ability to successfully incorporate underdrains and observation wells built with bio-retention ponds and outdoor recreational features. Our team installed porous asphalt and trench drains that tie into rain gardens to control water which align with the area’s rising trend of being environmentally conscious. These landscaping components are a responsible way to filter sediments as well as manage the hydrostatic flow of the on-site storm water run-off. The retention pond provides a positive environment for vegetation, a sanctuary for other wildlife, and then allows excess water to infiltrate native soils or is directed to nearby storm water drains.

Location : Maryland

Value : $ 1.4 Million

Client : Private / Commercial

Type : Green / Environmental, Parks & Athletic Fields

← ANACOSTIA FREEWAY BRIDGES RECONSTRUCTION
ANACOSTIA 2nd HIGH UTILITIES SERVICE →

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

  • Services
  • Projects
  • Subcontractors
  • Employment
  • About Us
  • Contact

WORK WITH US

For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

Small Business Outreach Program

FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer