Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

CITYWIDE SIDEWALK PAVEMENT RESTORATION

CITYWIDE SIDEWALK PAVEMENT RESTORATION





DDOT awarded Fort Myer Construction Corporation this contract to make various repairs to existing pavement structures such as pavement base, curbs, gutters, sidewalks, driveway entrances. This contract also included constructing wheelchair and bicycle ramps to meet regulations established by the Americans With Disabilities Act (ADA). At various areas around the city, Fort Myer was dispatched to resurface roadway sections, make preliminary repairs to existing structures, manage utility cuts, reset stone curb, replacing existing curb, furnish sewer-water manhole frames and basin tops, construct ADA ramps, and perform grading and excavating. In areas of AC surfaces, work consisted of milling to a depth of I” to 2″; cleaning and routing of deteriorated pavement joints, potholes, tar patches, striping, and filling with asphalt materials; adjusting any necessary manholes and boxes to grade; applying tack coat; and laying AC surface course.  An indefinite quantity of projects are possible under this contract, based on orders issued (maximum $20M; minimum $I00K) during the term for each period.

 

Project Significance

Due to the complexity and confined, aging infrastructure of the city, this repair work is continual, challenging, and sometimes with as little as 4 hour notice to commence work. With efficiency and precision, Fort Myer safely navigates the confined work spaces with large equipment and materials. Our client often praises the team for minimal disruptions and careful, swift work.

Location : District of Columbia

Value : $ 20 Million

Client : District Department of Transportation

Type : On Call & Emergency, Streetscape

← THEODORE ROOSEVELT BRIDGE MOVEABLE BARRIER
CONSTRUCTION OF DIAMOND TEAGUE PARK →

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

  • Services
  • Projects
  • Subcontractors
  • Employment
  • About Us
  • Contact

WORK WITH US

For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

Small Business Outreach Program

FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer