Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

Projects

You are here: Home » Projects

Projects


CITYWIDE ALLEY RECONSTRUCTION

Fort Myer Construction was retained to manage the upgrading of unimproved, poorly maintained alleys throughout the city of Washington, DC. This project involved a range of surfaces – asphalt, concrete, brick and cobblestone – based on the most comp  read more...

EASTERN AVENUE BRIDGE RECONSTRUCTION

The reconstruction of the aging bridge over Kenilworth Avenue at Eastern Avenue, NE along the busy interstate traffic corridor, involved demolition of the old structure; raising the clearance height of the bridge deck by 2 feet, reconstructing existing abutmen  read more...

RECONSTRUCTION OF PENNSYLVANIA AVENUE

The project consisted of total replacement of existing roadway with flexible pavement 12” in thickness, installation of bio-retention ponds that supplement new water quality basins in pre-treatment of stormwater run offs and new water main. The project also   read more...

REHABILITATION OF BRENTWOOD ROAD, NE

Involved the reconstruction and upgrading of Brentwood Road, 9th Street, W Street, and Edgewood Terrace, NE. Improvements included, storm drainage, streetlights, traffic signals, roadways, sidewalks and neighborhood landscape renovations.   Project Signif  read more...

MACARTHUR BLVD BIKEWAY IMPROVEMENTS

This project widened the existing road by four feet to provide three-foot bike lanes in each direction as well as additional bikeway improvements along 13,800 LF of MacArthur Blvd from I-495 to Oberlin Ave. Also created, was a five-foot minimum vegetative buff  read more...

DESIGN-BUILD FIRST STREET TUNNEL SITE WORK

The Clean Rivers Project, was a 13 mile system of tunnels and diversion sewers throughout the District of Columbia that mitigate flooding and reduce combined sewer overflows. The First Street Tunnel (FST) portion of the project extends along First Street NW, b  read more...

I-395 OVER GWMP BRIDGE REPAIR

Repair of I-395 Northbound, Southbound and H.O.V. bridges over George Washington Memorial Parkway in Arlington, VA.  Project scope included milling existing surface asphalt and replacement with rapid set latex modified concrete (LMC) overlay of bridge decks.   read more...

MD 185 (CONNECTICUT AVE) SAFETY AND RESURFACING IMPROVEMENTS

Project Description This safety and resurfacing improvements project on MD 185 (Connecticut Avenue) in Montgomery County includes patching PCC bus pads, grinding and resurfacing the existing pavement and installing stamped concrete and landscaping in the exist  read more...
Next page Previous page
  • Projects
  • Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    • Services
    • Projects
    • Subcontractors
    • Employment
    • About Us
    • Contact

    WORK WITH US

    For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

    Small Business Outreach Program

    FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

    Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer