RECONSTRUCTION OF PENNSYLVANIA AVENUE
The project consisted of total replacement of existing roadway with flexible pavement 12” in thickness, installation of bio-retention ponds that supplement new water quality basins in pre-treatment of stormwater run offs and new water main. The project also entailed modification and enhancements to the existing traffic signalization and street lighting system, installation of median islands to create turning lanes for vehicular traffic, improvement of sidewalk for pedestrian and bikers, and installation of trees and shrubbery.
Project Significance
This project demonstrates Fort Myer Construction’s ability to mobilize in highly traveled and high-profile urban residential/commercial areas to perform required contract tasks within tight time and space constraints. This project also demonstrates Fort Myer Construction’s capability to perform multidisciplinary activities such as pile and lagging and reinforced concrete retaining walls, provide and install electrical features, wiring, traffic signals, and placement of asphalt pavement.