Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

Projects

You are here: Home » Projects

Projects


KING STREET METRORAIL STATION ACCESS IMPROVEMENTS

The King Street Old – Town Metrorail Station Access Improvement project is to enhance this transportation hub and make a safer walking environment while maintaining efficient levels of service for buses and other transit vehicles accessing the site. This pro  read more...

SPRING VALLEY WATERMAIN REHABILTATION

As part of its Capital Improvement Program, DC Water is performing water and sewer rehabilitation projects throughout the city. This project involves the installation and rehabilitation of water infrastructure located in the Spring Valley neighborhood between   read more...

DESIGN-BUILD REHABILITATION OF I-66

This design-build rehabilitation project involved full-depth patching of concrete pavement and asphalt overlay across all six lanes on a 6.5 mile section of a highly traveled roadway connecting the spawning northern Virginia communities, the Dulles access road  read more...

NORMANSTONE/FULTON STREET CULVERT LOW IMPACT DEVELOPMENT

  The Normanstone Drive/Fulton Street Culvert Low Impact Improvement (LID) project will be a 4 phase project that will reconstruct Fulton Street and 34th street to Normanstone Drive and 30th street NW. The project will improve roadway condition, reduce ru  read more...

DESIGN – BUILD: ST. ELIZABETH TEMPORARY PARKING LOTS

  This Design-Build project was to construct 3 temporary surface parking lots on St. Elizabeths East Campus. These parking lots would be located at the Dorothea Dix Administration Building, R.I.S.E Demonstration Center and Parcel 15 located at 2730 Martin  read more...

WASHINGTON BOULEVARD BIKE TRAIL IMPROVEMENTS

  Washington Boulevard Bike Trail Improvements project constructed a bike and pedestrian trial along Washington Boulevard that provides a connection from Arlington Boulevard to Columbia Pike and a new access way into Towers Park. Our contract included con  read more...

GREEN INFRASTRUCTURE PROJECT

This Green Infrastructure project was comprised of constructing stormwater Green Infrastructure (GI) and Low Impact Development (LID) facilities in several sites within the DC area. These stormwater GI & LID facilities are aimed at reducing stormwater poll  read more...

WSSC STREET REPAIRS IDIQ

WSSC Street Repairs IDIQ project provides paving and restoration services following a water or sewer main replacement or repair. Work includes restoring streets, concrete roadways, driveways, curbs, gutters and sidewalks.   Fort Myer is among 2 contractor  read more...
Next page Previous page
  • Projects
  • Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    • Services
    • Projects
    • Subcontractors
    • Employment
    • About Us
    • Contact

    WORK WITH US

    For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

    Small Business Outreach Program

    FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

    Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer