Projects
KING STREET METRORAIL STATION ACCESS IMPROVEMENTS
The King Street Old – Town Metrorail Station Access Improvement project is to enhance this transportation hub and make a safer walking environment while maintaining efficient levels of service for buses and other transit vehicles accessing the site. This pro read more...
SPRING VALLEY WATERMAIN REHABILTATION
As part of its Capital Improvement Program, DC Water is performing water and sewer rehabilitation projects throughout the city. This project involves the installation and rehabilitation of water infrastructure located in the Spring Valley neighborhood between read more...
DESIGN-BUILD REHABILITATION OF I-66
This design-build rehabilitation project involved full-depth patching of concrete pavement and asphalt overlay across all six lanes on a 6.5 mile section of a highly traveled roadway connecting the spawning northern Virginia communities, the Dulles access road read more...
NORMANSTONE/FULTON STREET CULVERT LOW IMPACT DEVELOPMENT
The Normanstone Drive/Fulton Street Culvert Low Impact Improvement (LID) project will be a 4 phase project that will reconstruct Fulton Street and 34th street to Normanstone Drive and 30th street NW. The project will improve roadway condition, reduce ru read more...
DESIGN – BUILD: ST. ELIZABETH TEMPORARY PARKING LOTS
This Design-Build project was to construct 3 temporary surface parking lots on St. Elizabeths East Campus. These parking lots would be located at the Dorothea Dix Administration Building, R.I.S.E Demonstration Center and Parcel 15 located at 2730 Martin read more...
WASHINGTON BOULEVARD BIKE TRAIL IMPROVEMENTS
Washington Boulevard Bike Trail Improvements project constructed a bike and pedestrian trial along Washington Boulevard that provides a connection from Arlington Boulevard to Columbia Pike and a new access way into Towers Park. Our contract included con read more...
GREEN INFRASTRUCTURE PROJECT
This Green Infrastructure project was comprised of constructing stormwater Green Infrastructure (GI) and Low Impact Development (LID) facilities in several sites within the DC area. These stormwater GI & LID facilities are aimed at reducing stormwater poll read more...
WSSC STREET REPAIRS IDIQ
WSSC Street Repairs IDIQ project provides paving and restoration services following a water or sewer main replacement or repair. Work includes restoring streets, concrete roadways, driveways, curbs, gutters and sidewalks. Fort Myer is among 2 contractor read more...