Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

Projects

You are here: Home » Projects

Projects


MD 410 (EAST WEST HWY) SAFETY & RESURFACING IMPROVEMENTS

Work to restore MD 410 (East West Highway) from Carry Lane to Fenton Street in Montgomery County wrapped up ahead of schedule in October 2015. This project involved full depth patching, micro milling, resurfacing, upgrading curb and gutter, ADA ramps, sidewalk  read more...

DESIGN-BUILD SIMON ELEMENTARY SCHOOL LID PLAYGROUND

This playground is a design-build project for low impact development (LID) play area including demolition and removal of existing asphalt pavement play yard, and the installation of new civil and landscape elements.  Improvements consisted of a dry river drai  read more...

BELAIR MANSION DRIVEWAY REPLACEMENT

This contract was to remove and replace the existing Belair Mansion Driveway. The replacement material our team installed was exposed aggregate. Our team also removed and replaced the existing curb.   Project Significance Our team had 100 days to complete  read more...

SOUND WALL REPLACEMENT SW-106 DULLES TOLL ROAD

MWAA procured Fort Myer for this project to replace existing sound wall SW-106 along Dulles Toll Road. This job consisted of sound wall panel replacement for bridge-mounted, retaining wall-mounted, and ground-mounted structures.  On Dulles Access Road heading  read more...

RECONSTRUCTION OF 16TH STREET BRIDGE OVER MILITARY ROAD NW

Project Description The existing 16th Street, NW Bridge over Military Road was in an advanced state of deterioration with the load rating prior to demolition only slightly above the legal level. This project, exemplifying safe, effective, and efficient constru  read more...

DCA AIRSIDE PAVEMENT REPAIRS IDIQ

Metropolitan Washington Airports Authority procured Fort Myer Construction for this indefinite delivery, indefinite quantity (IDIQ) contract to help streamline the contract process and speed service delivery of asphalt repairs at Ronald Regan Washington Nation  read more...

CONNECTICUT AVE STREETSCAPE – PHASE 3

The scope of work included new street lighting, traffic signals, curb, gutter, paver sidewalk, site furnishings, landscaping and asphalt roadway paving & striping of Connecticut Ave. from L St. NW to Dupont Circle. This area is in the Golden Triangle neigh  read more...

IRVING STREET GREEN INFRASTRUCTURE PROJECT

As part of DC Water’s Clean Rivers Project, medium-term Bloomingdale flooding mitigation efforts are underway to reduce storm-water runoff. This is achieved by constructing Green Infrastructure to capture, infiltrate, and treat stormwater runoff before it en  read more...
Next page Previous page
  • Projects
  • Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    Search our projects here

    • Contract Value

      $Million - $Million
    • Year Completed

    • Services
    • Projects
    • Subcontractors
    • Employment
    • About Us
    • Contact

    WORK WITH US

    For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

    Small Business Outreach Program

    FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

    Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer