Projects
MD 410 (EAST WEST HWY) SAFETY & RESURFACING IMPROVEMENTS
Work to restore MD 410 (East West Highway) from Carry Lane to Fenton Street in Montgomery County wrapped up ahead of schedule in October 2015. This project involved full depth patching, micro milling, resurfacing, upgrading curb and gutter, ADA ramps, sidewalk read more...
DESIGN-BUILD SIMON ELEMENTARY SCHOOL LID PLAYGROUND
This playground is a design-build project for low impact development (LID) play area including demolition and removal of existing asphalt pavement play yard, and the installation of new civil and landscape elements. Improvements consisted of a dry river drai read more...
BELAIR MANSION DRIVEWAY REPLACEMENT
This contract was to remove and replace the existing Belair Mansion Driveway. The replacement material our team installed was exposed aggregate. Our team also removed and replaced the existing curb. Project Significance Our team had 100 days to complete read more...
SOUND WALL REPLACEMENT SW-106 DULLES TOLL ROAD
MWAA procured Fort Myer for this project to replace existing sound wall SW-106 along Dulles Toll Road. This job consisted of sound wall panel replacement for bridge-mounted, retaining wall-mounted, and ground-mounted structures. On Dulles Access Road heading read more...
RECONSTRUCTION OF 16TH STREET BRIDGE OVER MILITARY ROAD NW
Project Description The existing 16th Street, NW Bridge over Military Road was in an advanced state of deterioration with the load rating prior to demolition only slightly above the legal level. This project, exemplifying safe, effective, and efficient constru read more...
DCA AIRSIDE PAVEMENT REPAIRS IDIQ
Metropolitan Washington Airports Authority procured Fort Myer Construction for this indefinite delivery, indefinite quantity (IDIQ) contract to help streamline the contract process and speed service delivery of asphalt repairs at Ronald Regan Washington Nation read more...
CONNECTICUT AVE STREETSCAPE – PHASE 3
The scope of work included new street lighting, traffic signals, curb, gutter, paver sidewalk, site furnishings, landscaping and asphalt roadway paving & striping of Connecticut Ave. from L St. NW to Dupont Circle. This area is in the Golden Triangle neigh read more...
IRVING STREET GREEN INFRASTRUCTURE PROJECT
As part of DC Water’s Clean Rivers Project, medium-term Bloomingdale flooding mitigation efforts are underway to reduce storm-water runoff. This is achieved by constructing Green Infrastructure to capture, infiltrate, and treat stormwater runoff before it en read more...