Fort Myer Construction Website

A Leading Infrastructure Company in DC

  • Home
  • Services
    • Street & Highway
    • Bridges & Structures
    • Utilities
    • Electrical
    • Design-Build
    • Asphalt Supply & Paving
    • Snow & Ice Removal
  • Projects
  • Subcontractors
    • Bid List
    • Prequalification Application
    • Small Business Outreach Program
  • Employment
    • Current Job Openings
    • Diversity
    • Employee Portal
  • About
    • Awards and Recognition
    • Community Outreach
    • Representative Clients
    • News
    • Testimonials
    • Safety
  • Contact

NEW YORK AVENUE BRIDGE RECONSTRUCTION OVER RAILROAD TRACKS

NEW YORK AVENUE BRIDGE RECONSTRUCTION OVER RAILROAD TRACKS



Bridge Under Construction
NY Ave Bridge
Construction over Tracks
Amtrak Train Under Bridge

Under Construction
Completed Bridge from Median
Grand Opening with Mayor Gray
Plaque Displayed on Bridge

NY Ave Bridge Award Winning Project

A commendable and multi-award-winning design-build project involving the rehabilitation of a primary transportation corridor into Washington, DC, Fort Myer headed the upgrading of the 50-plus-year-old New York Avenue bridge. This project included the removal, lowering, and reconstruction of the twin-span bridge’s superstructure and piers, widening of existing abutments, and construction of a new historic sidewalk rail. Beginning in January 2011, a third girder was installed to create structural redundancy. Construction also included installation and removal of temporary structures to support equipment and protect personnel working over high-voltage wires and rail tracks. Other work included electrical rehabilitation and replacement of roadway lighting and pavement restoration to New York Avenue to match the elevation change of the bridge abutments.

 

Project Significance

The New York Avenue Bridge is used by more than 87,000 vehicles each day and crosses several busy commuter and freight rail lines run by Amtrak, CXS and Metro. This project demonstrates Fort Myer’s ability to reconstruct bridge spans and roadway approaches over electrified railroads along one of the highest traveled and congested passages in DC. Fort Myer was challenged with performing construction during very restricted nightly hours. Funds for the project were provided through the American Recovery and Reinvestment Act of 2009 (ARRA), and the project is the largest ARRA effort in the District.

Location : District of Columbia

Value : $ 39.4 Million

Client : District Department of Transportation

Type : Bridges & Walls, Design-Build, Electrical

← BRYANT STREET PUMPING STATION
DESIGN-BUILD OF I-495 NORTHERN SECTION SHOULDER USE →

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

Search our projects here

  • Contract Value

    $Million - $Million
  • Year Completed

  • Services
  • Projects
  • Subcontractors
  • Employment
  • About Us
  • Contact

WORK WITH US

For over 45 years, Fort Myer Construction Corporation has provided career opportunities enabling employees to develop and enhance their talents and skills. Visit our Employment Page to review current job openings.

Small Business Outreach Program

FMCC small business roundtables provide networking, training, and insight to strengthen small business capacities. Learn More

Copyright © 2018 Fort Myer Construction Corporation | Equal Opportunity Employer